
South West Rocks · NSW
Land connected
to the coast.
A considered residential release beside the golf course, moments from the beaches and village of South West Rocks.
Saltwater Links
Where everyday life meets the South West Rocks lifestyle.
Saltwater Links brings together generous homesites, established streets and a setting shaped by coast, bushland and the neighbouring golf course.
The growing neighbourhood includes a proposed public park and a dedicated pedestrian path that runs from within Saltwater Links all the way to the golf course, plus a planned road link between Shamrock Avenue and Phillip Drive.

Golf course living, coastal freedom
A direct path to the golf course
A dedicated pedestrian path takes residents from within Saltwater Links all the way to the golf course, creating a genuine door-to-course connection.
Close to the coast
Beaches, Back Creek, local cafés and the town centre are all part of everyday life here.
Room to build well
A mix of regular, wide-frontage and corner lots gives buyers genuine choice for their new home.
Engineered Class A soil
Every residential block has been engineered to a Class A soil standard, providing consistency across the entire release.

Proposed public park
Current land release
Find your place.
A clear view of current availability across Stages 6 and 7, including sold and under-offer homesites.
Masterplans
See the whole picture.
Explore the combined Stage 6 and 7 masterplan, or view each stage’s detailed plan. Plans remain subject to final survey and registration.
Open full-size plan ↗

South West Rocks
A coastal town people never want to leave.
Build close to the ocean, Trial Bay, Back Creek, the golf course and the relaxed village centre, all while coming home to a quiet residential setting.
Arrange a site inspectionFind Saltwater Links
See where coast, golf and village connect.
Explore the location around Shamrock Avenue, South West Rocks. Drag the map to look around, or pinch and zoom on your phone.
South West Rocks NSW 2431
A neighbourhood taking shape
Roads in. Homes rising. The coast close by.
The latest aerial imagery shows the established neighbourhood alongside the current stages, with new streets and homesites now clearly taking shape.
Construction & registration update
As at 22 September 2026
Stage 6
Civil construction is complete and titles have been lodged. Registration is anticipated in approximately 4 weeks.
Stage 7
Civil construction is anticipated to be complete in approximately 4 weeks, with registration anticipated in approximately 8 weeks.
Timeframes are indicative from the update date and subject to change. Contact the agents for the latest progress.

Local sales team
Reach out to the
agents below.
Contact Heath or Kingston for current availability, pricing, contracts or to arrange a private inspection of the release.
